Project Overview
The dredging system was designed to handle fine, low-settling materials while maintaining pond capacity and supporting ongoing processing operations.
The work focused on removing fine slimes from the secondary pond in a twin-pond system that used staged sediment separation. Water levels were adjusted to support dredging and slurry transfer, and the slurry was sent to a drying area via the client’s booster system. Site operations continued during the works.