Specialised dredging, desilting, and sludge removal for plastic lined process ponds and dams in mining and energy where conventional methods are ineffective.
UAT delivered dredging, screening and slurry transfer works to remove accumulated red mud sediments while operating within an active refinery environment and maintaining discharge management requirements.
Scope
Removal of accumulated red mud sediments from refinery settlement pond
Slurry transfer to site neutralisation infrastructure
Screening and collection of oversize material during dredging
Management of suspended solids near monitored discharge areas
Protection of pond liner and slurry transfer systems
Dredging completed while maintaining active pond operation
Outcome
Transfer of red mud slurry to site processing requirements
Reduced accumulated sediment within the pond system
Maintained active refinery pond operation during works
Maintained environmental monitoring and discharge management requirements
Protected liner systems and slurry transfer infrastructure