Fly Ash Settlement Pond Dredging – QLD

Specialised dredging, desilting, and sludge removal for plastic lined process ponds and dams in mining and energy where conventional methods are ineffective.

Project Overview

Accumulation of fine fly ash within the settlement pond was reducing available storage capacity and impacting settling performance.

Scope

  • Ongoing removal of overflow fly ash from secondary pond
  • Management of fine, non-compacted ash with high water coverage
  • Operation within active industrial environment
  • Water level controlled to optimise dredging performance
  • Slurry transfer to adjacent discharge point
  • Controlled dredging approach suited to pond configuration

Outcome

  • Maintained continuous sediment management within the pond
  • Restored and sustained effective storage capacity
  • Improved settling performance and water reuse conditions
  • Minimized re-suspension of fine ash during removal
  • Efficient extraction of non-compacted material using jetting and suction