Slimes Pond Management – Mineral Sands – WA

Specialised dredging, desilting, and sludge removal for plastic lined process ponds and dams in mining and energy where conventional methods are ineffective.

Project Overview

The dredging system was designed to handle fine, low-settling materials while maintaining pond capacity and supporting ongoing processing operations.

Scope

  • Removal of slimes from secondary process pond
  • Management of fine, semi-fluid material with variable consistency
  • Operation within twin pond system with staged sediment separation
  • Water levels adjusted to optimise dredging and material movement
  • Transfer of slurry to drying area via client booster system

Outcome

  • A controlled removal approach efficiently managed the fine suspended solids without excessive disturbance
  • Improved management of slimes within the pond system
  • Enhanced performance of staged sediment separation
  • Stabilised material handling across variable slurry conditions
  • Reduced risk of long-term sediment build up
  • Maintained continuous operation during works