Fly Ash Settlement Pond Dredging – QLD
A secondary fly ash pond required ongoing sediment management due to overflow from upstream thickening processes, with fine ash impacting settling performance and storage capacity.
Project Overview
Location: Queensland
Industry: Energy
Asset: Settlement Pond
Accumulation of fine fly ash within the settlement pond was reducing available storage capacity and impacting settling performance.
Scope
- Ongoing removal of overflow fly ash from secondary pond
- Management of fine, non-compacted ash with high water coverage
- Operation within active industrial environment
- Water level controlled to optimise dredging performance
- Slurry transfer to adjacent discharge point
- Controlled dredging approach suited to pond configuration

Outcome
- Maintained continuous sediment management within the pond
- Restored and sustained effective storage capacity
- Improved settling performance and water reuse conditions
- Minimized re-suspension of fine ash during removal
- Efficient extraction of non-compacted material using jetting and suction

Related Services
Process Pond and Dam Dredging
Sediment, Sludge & Slurry Removal
Related Case Studies
Other Dredging Case Studies
Other Industrial Case Studies
Discuss a Similar Project
Speak with our team about a tailored solution for your site conditions, materials, and operational requirements.