Slimes Pond Management - Mineral Sands - WA

A twin plastic-lined pond system separated heavier sediments from fine slimes, with accumulation in the secondary pond impacting material handling and performance. A controlled removal approach suited to variable, high-fines material was required.

Project Overview

Location: Western Australia
Industry: Mineral Sands Processing
Asset: Process Pond

The dredging system was designed to handle fine, low-settling materials while maintaining pond capacity and supporting ongoing processing operations.

Scope

  • Removal of slimes from secondary process pond
  • Management of fine, semi-fluid material with variable consistency
  • Operation within twin pond system with staged sediment separation
  • Water levels adjusted to optimise dredging and material movement
  • Transfer of slurry to drying area via client booster system
Mineral sands slimes pond secondary pond sediment removal western australia

Outcome

  • A controlled removal approach efficiently managed the fine suspended solids without excessive disturbance
  • Improved management of slimes within the pond system
  • Enhanced performance of staged sediment separation
  • Stabilised material handling across variable slurry conditions
  • Reduced risk of long-term sediment build up
  • Maintained continuous operation during works
Mineral sands slimes sediment discharge

Related Services

Process Pond and Dam Dredging

Sediment, Sludge & Slurry Removal

Related Case Studies

Other Dredging Case Studies

Other Industrial Case Studies

Discuss a Similar Project

If your site is experiencing reduced pond capacity or challenges with fine sediment management, UAT can provide a technically appropriate dredging approach suited to your operating conditions.